Formwork oil 20L - 24 items / pallet
Files to download
Possible delivery options
Any questions?
Description
Properties
Application:
The coated formwork surfaces must be clean and dry. Remove rust and remnants of old concrete. The preparation is ready to use and must not be diluted. Spray with a thin but covering layer using a high pressure (4-6 bar) spraying device. Concreting can be done after 30 - 60 minutes from the application of the preparation.
Temperature of execution: from 0 ° C to +80 ° span > C.
Consumption: approx. 1 kg for 35-60 m2? of the formwork surface depending on the absorbency of the substrate.
Can be transported by any means of transport at a temperature not lower than -5 ° C. Not subject to RID / ADR regulations.
Warranties:
Translations of product names and their descriptions have been translated using Google Translate.
Technical data
| Supplier: | R-S SYSTEM |
| Usage: | approx. 1 kg for 35-60 m2 of formwork |
| Weight: | 20 kg |
| Capacity: | 20L |
Contact